Welcome: Shanghai cixi instrument CO.,LTD,it's a professional 35 years manufacturer of micro flow meter,ultrasonic flow meter,water flow meter,magnetic flow meter,turbine flow meter,vortex flow meter,coriolis flow meter,digital flow meter,thermal mass flow meter,liquid flow meter,gas flow meter,dosing pump,gear metering pump,level transmitter,level sensor etc.

Industry News

Home > News > Industry News >

Installation of electromagnetic flowmeter

Electromagnetic flowmeter installation matters, electromagnetic flowmeter has many high quality characteristics, has been widely used in metallurgical industry, chemical plant, petrochemical industry, pharmaceutical industry, food, agriculture and livestock husbandry and family.Application of electromagnetic flow timing to increase its use period, the first should be effective selection, appropriate installation applications, to maintain reliable and accurate measurement.Below small make up I give everyone to share the installation of the electromagnetic flowmeter common problems:

Installation of electromagnetic flowmeter

Installation of electromagnetic flowmeter

 

1. During installation, there must be straight pipe sections at the front, back and right sides. For on-site installation, the minimum requirement is that the front straight pipe section should not be less than 10D and the back straight pipe section should not be less than 5D, so as to ensure sufficient development of flow pattern of fluid entering the accurately measured pipe.

 

2. During installation, avoid lifting too much ground stress on the processing pipeline, especially on the ultra-high pressure pipeline, if it is impossible to prevent the elbow from being installed to release the ground stress.

 

3. The connection between the controller of the separated electromagnetic flowmeter and the converter must be shielded by the required cable, and cannot be replaced by other cables.And the signal cable must be worn independently in the grounding protection steel tube, and be strictly separated from other power sources.In addition, the fewer signal cables and excitation cables, the higher.

 

4. Install globe valves or bypass pipes before and after the dashboard to facilitate timely maintenance, installation and disassembly of the dashboard.

 

5. Avoid the site of strong vibration natural environment and strong corrosion vapor as far as possible to avoid the destruction of insulation layer between the electrical level and the pipeline.

 

Shanghai porcelain xi instrument & meter co., ltd. was established in 2011, which is the beginning of porcelain xi's r&d and production of high-quality, high-precision flowmeters. We have introduced the Siemens CNC machining center system, cutting accuracy is higher than 0.001mm, the products have obtained the national multiple invention certification, the production strictly implements the ISO9001 certification.At the same time, we also provide customized instrument manufacturing solutions, with a strong r & d capabilities 3 to 4 weeks to high quality delivery.